• mohit
  • September 18, 2024

The pipes are conveyed to the finishing bay for finishing, testing and inspection. Hydro testing of pipes is undertaken to detect leaks and fissures prior to galvanizing and threading. The pipes are subsequently galvanized/black varnished/threaded as per specification/client requirement.

Written by

mohit

Voluptates et quia corrupti possimus hic natus at pariatur. Veritatis quisquam et at voluptatem. Fugiat dolorem magnam explicabo dolore.